ASA High Hardness Heat Treatment Sprocket

ASA High Hardness Heat Treatment Sprocket

ASA Substantial HARDNESS Warmth Treatment method SPROCKET (35)

1. Generate strictly in accordance with ANSI common dimension
2. Substance: 1045 metal / Stainless Metal 304 & 316
3. CZPT: ANSI, DIN, JINS, ISO, CZPT America or customer’s drawing
four. Pilot bore, completed bore, taper bore and specific bore. 
five. CZPT surface area and higher precision
six. Innovative warmth treatment method and surface treatment craft
7. Very best high quality and aggressive cost. 
8. Welcome OEM / ODM
9. Processing gear: Hobbing machine, slotting machine, CNC lathes and other products.
ten. Sprocket designs: Contains special sprocket according to customer’s drawings, normal sprocket (American regular and metric).

Product name 

ASA Substantial HARDNESS Heat Treatment method SPROCKET (35)

Materials Available  one. Stainless Steel: SS304, SS316, etc
two. Alloy Steel: 1045, 45Mn, 42CrMo, 20CrMo, and so forth
3. OEM according to your request
Area Treatment method Heat therapy, Quenching treatment method, Higher frequency normalizing remedy, Polishing, Electrophoresis paint processing, Anodic oxidation treatment method, and so on
Attribute Fire Resistant, Oil Resistant, Heat Resistant, Abrasive resistance, Oxidative resistance, Corrosion resistance, etc
Style criterion ISO DIN ANSI & CZPTer’s Drawing
Dimensions CZPTer’s Drawing & ISO CZPT 
Application CZPT transmission tools
Bundle Wood Situation / Container and pallet, or manufactured-to-buy
Certificate CZPT: 2008 
Advantage First quality, Ideal provider, Aggressive value, Quick delivery
Shipping and delivery Time twenty times for samples. 45 days for official order.

one. keep equipments nicely preserved, enable top quality be far better assured.

2. standard functioning, function standardized.

3. SHangCZPTs are an expression of a spirit of support.

1. Are you company or trade Company?
We are a manufacturing unit established in 1951 with trade team for global service.

2. What terms of payment you usually use?
T/T 30% deposit and 70% from document, Western Union, L/C at sight

three. what is your lead time for your goods?
Generally forty five times following confirmed purchase. 30 days could be CZPT in reduced time for some things (throughout Might to July), and 65 days for the duration of new year and scorching period ( Jan to March).

4. Do you have right after-sale support?

Resposible Right after-sale services crew ,resolving your problem at any time.

1. Any inquiry about the chain would be replied within 24 hrs.

two. Properly-trained and seasoned sales staffs will reply all your worries in fluent English or Spanish.

three. OEM companies are CZPT with us, our professional designer would make your non-public concept into becoming.

four. Safety of your sales region, concepts of design and style and all your non-public info.

5. Supply by air mail or ship for your orders.

ASA High Hardness Heat Treatment Sprocket

Tags:

roller chains

As one of leading roller chains manufacturers, suppliers and exporters of products, We offer roller chains and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of roller chains

Recent Posts